Forsys Reports Interim Drilling Results at Norasa


TORONTO, May 28, 2024 (GLOBE NEWSWIRE) -- Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) ("Forsys" or the "Company")

Forsys is pleased to provide an update on the Company's Norasa Uranium project ("Norasa1") with interim results from its 2024 Resource Extension and Exploration target drilling program at Valencia (ML 149).

Highlights

The drilling program strategy is to expand and upgrade the Valencia resources, adjacent to the main pit and to the north and northeast of the pit. Six areas of mineralisation potential were delineated from exploration work that includes aerial photo interpretation; geological mapping; aeromagnetic surveys; airborne radiometric and ground scintillometer surveys; and review of historic drilling data. Drilling aims to assess mineralisation extension potential at two targets in the vicinity of the Valencia Main pit and to test the potential of four targets to the north and east of the pit (see Figure 1).

A total of 60 boreholes for 8,512 metres of combined percussion and diamond drilling have been scheduled for this program. Twenty-two of the first percussion drill holes, including 2 diamond drill extensions, intersected uranium mineralisation. Four PQ diameter diamond holes are underway at Valencia main to retrieve metallurgical samples.

Valencia Main Pit Extension Drilling
Drilling has focused on two zones, to date, that have the potential to extend the Valencia Main deposit: at Valencia West and at Valencia South, to depths of up to 380 metres below surface. Completed and planned collar locations are shown with a ground scintillometer background in Figure 1.

The resource extension drill program tested potential targets adjacent to the main pit and includes:

Valencia Exploration Drilling
The neighbouring exploration target drill program is planned to identify additional resource potential at the Jolie Zone, Valencia East, Bundu, and Valencia North (Figure 1). Twenty-eight boreholes are scheduled, comprising 2,280 metres of drilling across the four targets:


Figure 1: Overview map of the 2024 drill program as of 16 May 2024. (ground scintillometer U-survey over GSN airborne Radiometric U data.)

Drilling Progress and Highlights
Table-1 below provides details of the recent boreholes completed:

TargetBHIDFrom
(m)
To
(m)
Width
(m)
eU3O8
(ppm)
U3O8
(ppm)
Status
Valencia WestVA24-001698314 291Complete
and:VA24-00192986218 Core sampling
and:VA24-0011231462376 Core sampling
Valencia WestVA24-002718211 190Complete
and:VA24-00210712316 222Complete
Valencia WestVA24-00352597 110Complete
Valencia WestVA24-0041031052162 Core sampling
Valencia WestVA24-005809616 104Complete
Valencia WestVA24-00633352 216Complete
Valencia WestVA24-007617514 161Complete
Valencia WestVA24-00849567 142Complete
and:VA24-0089410814 148Complete
Valencia WestVA24-009356631 117Complete
including:VA24-00944484 200Complete
Valencia WestVA24-010375215 89Complete
Valencia WestVA24-01195647 123Complete
Valencia WestVA24-012395617 170Complete
Valencia WestVA24-01359623 96Core sampling
Valencia WestVA24-014142511 128Complete
Valencia WestVA24-015559035 96Complete
Valencia WestVA24-0169178 89Complete
Valencia WestVA24-01717225 95Complete
Valencia WestVA24-018154227 107Complete
JolieVA24-01914241 185Complete
including:VA24-01961812 336Complete
JolieVA24-020647814 110Complete
JolieVA24-021227149 137Complete
and:VA24-0218410420 174Complete
Valencia SouthVA24-0220232232 194Pre-collar complete
including:VA24-0228414864 246Assays received
includingVA24-02218923243 416to end of pre-collar

Table 1: 2024 drill campaign; highlights reported from boreholes completed (as of 16 May, 2024); Widths are reported as drill hole lengths. Unless otherwise stated, true width is estimated to be approximately 75% of the downhole width.

QAQC
Recent (2023-2024) Sampling and Assays

External Check Assay Laboratory
Four percent of the samples sent to TEA Labs are sent for check analyses to SGS Laboratories (SGS) in South Africa; SGS which serves as the independent accredited laboratory. The sample results are further validated by comparison with the radiometric scans.

Qualified Persons Statement for Mineral Resource
The information in this release that relates to the Interim Drilling Results for the Norasa Project is based on information compiled or reviewed by Dr Guy Freemantle of The MSA Group (Pty) Ltd., Johannesburg, South Africa. The MSA Group are independent consultants to the Norasa Project, Namibia. Dr Freemantle holds a Bachelor of Science in Geology (2006) and Doctor of Philosophy in Geology (2017) both at the University of the Witwatersrand. He is a member of the Society of Economic Geologists (892905); a Fellow of the Geological Society of South Africa (965392); and is registered with SACNASP (Registration 117527). Dr Freemantle has practiced his profession continuously for 14 years and has sufficient experience and knowledge that is relevant to the style of mineralisation and type of deposits under consideration as well as to the activity that is being undertaken to fulfil requirements of a Qualified Person as per NI 43-101. Dr Freemantle consents to this release in the form and context in which it appears.

About Forsys Metals Corp.

Forsys Metals Corp. (TSX: FSY, FSE: F2T, NSX: FSY) is an emerging uranium developer focused on advancing its wholly owned Norasa Uranium Project, located in the politically and uranium friendly jurisdiction of Namibia, Africa. The Norasa Uranium Project is comprised of the Valencia Uranium deposit (ML-149) and the nearby Namibplaas Uranium deposit (EPL-3638). Further information is available at the Company website www.forsysmetals.com

On behalf of the Board of Directors of Forsys Metals Corp. Richard Parkhouse, Director, Investor Relations. For additional information please contact:

Pine van Wyk, Country Director, Forsys
email: [email protected]

R ichard Parkhouse, Director, Investor Relations
email: [email protected] email: [email protected]
phone : +44 7730493432

Nikolas Matysek, Communications Manager (Canada)
email: [email protected]

Forward Looking Statement

Certain information contained in this press release constitutes "forward-looking information", within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has the potential to". Forward looking statements contained in this press release are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: market conditions and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR+ at www.sedarplus.ca. The forward-looking statements included in this press release are made as of the date of this press release and Forsys Metals Corp disclaim any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

                                                                      

1 The Norasa Uranium Project ("Norasa") is wholly owned by the Company's 100% subsidiary Valencia Uranium (Pty) Ltd. ("Valencia Uranium") and comprises the Valencia uranium deposits (held under ML-149) ("Valencia") and the Namibplaas uranium deposit (under EPL-3638, application for ML-251) ("Namibplaas"), located in the Erongo region of Namibia.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/6ba6af87-83a2-4e0e-a297-b75f620e7093



These press releases may also interest you

2 jui 2024
North American lithium producer Sayona Mining Limited ("Sayona") is pleased to announce that Mr. Lucas Dow has been appointed to the role of Managing Director and Chief Executive Officer (MD & CEO) effective 3 July 2024. Lucas first joined...

2 jui 2024
Oceanic Iron Ore Corp. ("Oceanic", or the "Company") is pleased to announce that it has elected to settle an aggregate of $92,651 in accrued interest due under the Company's previously issued Replacement Series A Convertible Debentures, Replacement...

2 jui 2024
Island Passage Development Canada Limited (IPDC or the "Company") announces the commencement of Phase Two of its mineral exploration program on the EL02 exploration license on Bougainville. Operations are conducted through its PNG subsidiary, Island...

2 jui 2024
Barton Gold Holdings LimitedHIGHLIGHTSTarcoola JORC (2012) Mineral Resources increased to ~20koz @ ~2 g/t Au at PerseveranceResources within 60 - 80 metres of open pit floor, with potential depth / strike extensionsFig 1 - Plan view showing...

2 jui 2024
Diamcor Mining Inc. (FRA:DC3A), ("Diamcor" or the "Company"), (the "Company") announces that it has closed a second and final tranche of CND$600,300.00 of its previously announced non-brokered private placement (the...

2 jui 2024
Jul 3rd, 2024 ? Sydney, Australia Patriot Battery Metals Inc. (the "Company" or "Patriot")  advises that Mr Blair Way has retired...



News published on and distributed by: